Blackwell Road Improvements

Langsford Road to Legacy Park Entrance

Client: City of Lee's Summit, Missouri

This 0.75-mile thoroughfare improvement project will widen the existing two-lane, open ditch road to three lanes. Access management and traffic control are critical items. In addition, intersection traffic control methods, including a traffic signal and a roundabout was considered at the Blackwell Road/ Langsford Road intersection. Alternative intersections at Blackwell Road/ Chipman Road were also evaluated to choose between a stop-controlled and roundabout intersection.

SIGNIFICANT DESIGN ITEMS:

  • Thoroughfare widening
  • Roundabout analysis
  • Converting open-ditch storm sewer system
  • Drainage analysis and design
  • Property descriptions
  • Public involvement
  • Utility coordination
  • Construction traffic control
  • Landscaping
  • Street lights

COMPLETION DATE: 2008

COST: $2.8 MILLION