HomeAbout AffinisServicesJoin Our TeamWhat's NewContact UsClient SatisfactionLinks

New Longview Development

Lee's Summit, Missouri

Client:Gale communities, inc.

The master plan for this development called for the restoration of historic Longview Farm as well as development of the surrounding 260 acres. Affinis was responsible for the design of Southwest Longview Boulevard, the backbone arterial through this development that included integration of buildings and other characteristics of the historical Longview Farm area.

Southwest Longview Boulevard serves as the main arterial through this Traditional Neighborhood Design (New Urbanism) project.  Design standards included narrower lanes and development of a “Parisian” type boulevard to fit the character of the development.

SIGNIFICANT DESIGN ITEMS:

  • Roundabout layout
  • Roadway design
  • Collaboration with other design professionals
  • Storm sewer design
  • Accelerated design and construction schedules
  • New Urbanism planning concepts
  • Construction phasing
  • Collaboration with Lee's Summit
  • Site development

COMPLETION DATE: 2005

COST: $8 MILLION

PROJECT PHOTOS (Click to enlarge)

DURING CONSTRUCTION

 


 

 



AFTER

New Longview Development