HomeAbout AffinisServicesJoin Our TeamWhat's NewContact UsClient SatisfactionLinks

Downtown Blue Springs Master Plan

Client: City of Blue Springs, Missouri

Affinis was part of a team led by 180 Degrees Design Studio that developed a new master plan for downtown development.  Citizen surveys identified downtown as one of the top two priorities for the City.  In turn, the city completed a master plan to look for long-term potential development options.  The plan development process revolved around a seven-day charrette that solicited public input in an open-house format.  Affinis provided transportation planning and connectivity solutions, traffic engineering analysis and roadway improvement phasing options.

SIGNIFICANT DESIGN ITEMS:

  • Seven-day charrette
  • Collaboration with a 17-member design team
  • Transportation planning
  • Roadway connectivity
  • Traffic impact analysis
  • Roadway phasing
  • Cost estimating
  • Transit oriented design
  • Pedestrian friendly design
  • MARC Coordination

COMPLETION DATE: 2006 STUDY COMPLETION

COST: $22 MILLION, ESTIMATED

PROJECT PHOTOS (Click to enlarge)